Dell quotes Dell. HPE quotes HPE. Who checks both?

Windows Server 2016 leaves Microsoft support on January 12, 2027,¹³ and server CPU and board lead times run near a year.¹⁴ We carry Dell and HPE, with Cisco, Arista, NetApp, Nutanix, Veeam and others, and we design, supply, integrate, deploy and support what you choose. Whoever recommends it delivers it, and if one maker's date slips we can offer another. We earn when you buy through us. One room or a whole campus.

Design: 2 hours to recover¹

Design: at most 15 minutes lost²

Design: one spare server per site³

Test plan: 20 tests with pass marks⁴

Three power feeds. One fire. Airport closed.

  • The cases on this page are public record, not our clients. Heathrow airport has three separate power feeds. On the night of March 20, 2025, a fire at a nearby substation cut one. Part of the airport lost power, including critical systems, and Heathrow closed. Its backup plan relied on manual switching, an estimated 10 to 12 hours.⁵
  • The grid, generators and building are yours or your facility partner's. We write into your requirement: what each rack draws, from the configured spec sheets, what carries it when the grid goes, how fast it switches over, and what shuts down first.
  • Our published design starts with a survey of both sites: rack space, power per rack, cooling, uplinks.⁶
  • We check: every option against that line, with a source under every figure.

Two data centers. One heatwave.

The cooling plant is yours or your facility partner's. We give them the load per rack of what we supply.

Cooling towers
Rows of cooling units on a data center roof, from above

In a July 2022 heatwave that reached 40°C, these London hospitals' two data centers, under two miles apart and each the other's backup, both failed.⁷ Each site must be able to carry the whole estate.

Cooling towers
Rows of cooling units on a data center roof, from above

In a July 2022 heatwave that reached 40°C, these London hospitals' two data centers, under two miles apart and each the other's backup, both failed.⁷ Each site must be able to carry the whole estate. Guy's and St Thomas' hospitals

Twenty minutes to critical heat.

Proton, the encrypted email company, says denser servers cut the time to critical heat from 3 to 4 hours to 20 minutes.⁸ So power and cooling limits per rack go in writing, from the configured spec sheets.

We supply and install the racks, A and B power feeds, top-of-rack and out-of-band switches. Elevations drawn before staging, every rack in the as-built.⁹

AMD or Intel? Dell or HPE?

We supply both. Dell PowerEdge R7725 with AMD EPYC 9005, up to 6 TB of memory. HPE ProLiant DL380 Gen12 with Intel Xeon 6, up to 8 TB.¹⁰ Staged and burned in before install, with the end-of-support date of every item on the quote.¹¹

Proton says a server shortage meant its equipment, if lost, could not be replaced on short timelines.⁸ So one spare server per site.³ Our test plan: a server stops under load, and its machines restart elsewhere within 5 minutes.⁴ Which platform runs on top? Our six-platform comparison.

  • Ask the architect who wrote it.

    Go through our published two-site design and its 20 tests with the architect who wrote them.

  • Start with one purchase.

    Send what you need to buy and by when. You get a reply the same day, then a quote.

A network switch mounted in a rack, no people

Led by Steve Phillips

A network switch mounted in a rack, no people

Steve Phillips, Principal Data Center Architect · CCSP · CCIE · AWS Certified Security – Specialty — credential IDs on request

He wrote the two-site private-cloud design: two sites 40 km apart, each able to carry the whole estate, on hyperconverged servers or VMware Cloud Foundation.

  • Two sites, 40 km apart
  • Sized for 250 virtual machines, 400 by 2029
  • One spare server per site
  • Recovery plans tested twice a year
  • 20 tests with pass marks

Two data centers. Tested in one.

UK bank TSB planned to test digital banking across both data centers for its 2018 migration, then tested on one. After go-live, configuration errors in the two data centers failed customer sessions. In 2022 its regulator fined TSB, for wider failings in risk management and governance.¹²

We write into your requirement: test both sites, in the setup you will run. Our test plan: a whole site is lost, and everything protected runs at the other, then fails back.⁴

  • Network.

    Cisco, Arista, Juniper and others, supplied and installed. Our design: two top-of-rack switches at 100G per site. Power one off: no impact.⁴

  • Storage.

    NetApp, Dell, HPE, Nutanix and others, supplied and installed. Pull a drive under load: no impact.⁴

A long lit aisle of data center racks
A long lit aisle of data center racks

Bring one purchase.

Request a quote

Send what you need to buy and by when. You get a reply the same day, then a quote with the end-of-support date of every item.¹¹

Design. Supply. Integrate. Support.

¹ Data Center Blueprint, item 4: recovery time 2 hours at the second site; recovery plans tested twice a year.

² Data Center Blueprint item 3: at most 15 minutes of data lost if a site goes.

³ Data Center Design: eight servers per site, seven carry the load and one is spare; each site can carry the whole estate.

⁴ Data Center Test Plan: 20 tests, each with a written pass mark. T8: a server is stopped under load; pass, its machines restart on the others within 5 minutes. T9: a drive is pulled under load; pass, no impact. T10: one top-of-rack switch is powered off; pass, no impact. T13: a whole site is lost; pass, every protected group runs at the other site in time, and failback is tested.

⁵ NESO, North Hyde Review Final Report, June 30, 2025, §2.2, §2.10, §2.11, §9.

⁶ Data Center Design section 2, P1: site survey of both sites, owner Symbeeo.

⁷ Guy's and St Thomas' review, January 2023, §2.3, §2.4, §6.

⁸ Proton's incident report, August 28, 2026.

⁹ Data Center Design sections 5, 9.5.

¹⁰ Data Center Blueprint items 8 and 9: vendor-published figures.

¹¹ Data Center Design section 2 P7, section 9.3: staging and burn-in window; no equipment is quoted past its vendor's end-of-sale date; the quote shows the end-of-support date of every item.

¹² PRA Final Notice to TSB, December 20, 2022, §1.1, §2.22, §2.25: non-functional testing of digital channels, planned for both data centers, run on one.

¹³ Microsoft, Windows IT Pro Blog, end of support for Windows Server 2016, read November 6, 2026.

¹⁴ TrendForce press release, April 15, 2026.

The cases named above are public record, not our clients. The lines we write are our reading, not the source’s.